29.07.2022, 08:34
Greetings
I have to upgrade to an old supervisor that no longer works, I installed a reactor, being the PC supervision I was going to do the pages.
In VISU, how can I create schedulers similar to those attached in the attached file , the times and days must be modifiable by the customer.
A thousand thanks
I have to upgrade to an old supervisor that no longer works, I installed a reactor, being the PC supervision I was going to do the pages.
In VISU, how can I create schedulers similar to those attached in the attached file , the times and days must be modifiable by the customer.
A thousand thanks