schedulazione in visuale - Frank68 - 29.07.2022

Greetings
I have to upgrade to an old supervisor that no longer works, I installed a reactor, being the PC supervision I was going to do the pages.
In VISU, how can I create schedulers similar to those attached in the attached file , the times and days must be modifiable by the customer.



A thousand thanks


RE: schedulazione in visuale - Daniel - 29.07.2022

You can get exactly the same in LM scheduler form functionality point of view. Graphically it will looks different.


RE: schedulazione in visuale - Frank68 - 29.07.2022

(29.07.2022, 08:37)Daniel Wrote: You can get exactly the same in LM scheduler form functionality point of view.  Graphically it will looks different.

Hi Daniel

I have prepare schedule , but in the logic machine manual is some strange , I have 2 address OBJECT Address ( the scheduler address ?) and the object on of addres, in the manual i have only one addres , if the object address is the scheduler address is possible tu use it for enable and disable the scheduler , or is only a state ?

Thank's


RE: schedulazione in visuale - Daniel - 29.07.2022

Object is the object the scheduler will control. Scheduler on/off object: is object via which you can enable/disable this scheduler.
This is the latest manual, you probably looked in to an older version.
https://openrb.com/wp-content/uploads/2022/05/LM-manual_3.2022.pdf


RE: schedulazione in visuale - Frank68 - 04.08.2022

(29.07.2022, 13:10)Daniel Wrote: Object is the object the scheduler will control. Scheduler on/off object: is object via which you can enable/disable this scheduler.
This is the latest manual, you probably looked in to an older version.
https://openrb.com/wp-content/uploads/2022/05/LM-manual_3.2022.pdf
Hi Daniel

One question the scheduler set the value on time I need, outside this time needed to reset from scheduler or if not set from the secheduler time , automaticaly reset the value?

TAnk's a lot


RE: schedulazione in visuale - admin - 04.08.2022

You don't specify a time period in schedulers. Instead you specify events that run at a certain time. For example event 1 turns light ON at 10:00, event 2 turns light OFF at 18:00.