schedulazione in visuale - Printable Version +- Logic Machine Forum (https://forum.logicmachine.net) +-- Forum: LogicMachine eco-system (https://forum.logicmachine.net/forumdisplay.php?fid=1) +--- Forum: Visualization (https://forum.logicmachine.net/forumdisplay.php?fid=9) +--- Thread: schedulazione in visuale (/showthread.php?tid=4163) |
schedulazione in visuale - Frank68 - 29.07.2022 Greetings I have to upgrade to an old supervisor that no longer works, I installed a reactor, being the PC supervision I was going to do the pages. In VISU, how can I create schedulers similar to those attached in the attached file , the times and days must be modifiable by the customer. A thousand thanks RE: schedulazione in visuale - Daniel - 29.07.2022 You can get exactly the same in LM scheduler form functionality point of view. Graphically it will looks different. RE: schedulazione in visuale - Frank68 - 29.07.2022 (29.07.2022, 08:37)Daniel Wrote: You can get exactly the same in LM scheduler form functionality point of view. Graphically it will looks different. Hi Daniel I have prepare schedule , but in the logic machine manual is some strange , I have 2 address OBJECT Address ( the scheduler address ?) and the object on of addres, in the manual i have only one addres , if the object address is the scheduler address is possible tu use it for enable and disable the scheduler , or is only a state ? Thank's RE: schedulazione in visuale - Daniel - 29.07.2022 Object is the object the scheduler will control. Scheduler on/off object: is object via which you can enable/disable this scheduler. This is the latest manual, you probably looked in to an older version. https://openrb.com/wp-content/uploads/2022/05/LM-manual_3.2022.pdf RE: schedulazione in visuale - Frank68 - 04.08.2022 (29.07.2022, 13:10)Daniel Wrote: Object is the object the scheduler will control. Scheduler on/off object: is object via which you can enable/disable this scheduler.Hi Daniel One question the scheduler set the value on time I need, outside this time needed to reset from scheduler or if not set from the secheduler time , automaticaly reset the value? TAnk's a lot RE: schedulazione in visuale - admin - 04.08.2022 You don't specify a time period in schedulers. Instead you specify events that run at a certain time. For example event 1 turns light ON at 10:00, event 2 turns light OFF at 18:00. |