Is this even possible when the Networks are physicaly not connected ?
I had the same Problem last Year. The Customer want a new Visualization with the Possibility to send KNX values to BacNET.
But when we started the Project there was no way due to Security reasons for having acces to both networks via one Port.
The Solution was not nice, we buildt a extra line with an KNX Router just to use the TP UART Mode and stay in the BacNET Network. The Bus Load is avarage 60-75%.
Will there be an Solution in the Future ?