15.06.2023, 14:03
(15.06.2023, 11:16)admin Wrote: How long should the transition time be for your use case?
i normally use between 30 and 60 seconds. It depends on the size of the fans. But in AHU (up to 10.000m3/h) i use transition time of 60 seconds because of the mass of the rotor. Going too fast puts a lot torque on all the components :-)
I understand where the 10 seconds come from as the module is intended to be used with lights and dimming and not for fan speed control.