04.04.2017, 12:19
Hi again,
Finished merging the two projects and i use an IP Interface to connect the LM LB and LM Reactor to TP Line.
Both LM's KNX connection mode is set to IP Tunneling.
Is there any way dynamicaly change the LM's Reactor mode to TP-UART in order to use is as a backup-redundancy connection to TP line?
Finished merging the two projects and i use an IP Interface to connect the LM LB and LM Reactor to TP Line.
Both LM's KNX connection mode is set to IP Tunneling.
Is there any way dynamicaly change the LM's Reactor mode to TP-UART in order to use is as a backup-redundancy connection to TP line?