This forum makes use of cookies to store your login information if you are registered, and your last visit if you are not. Cookies are small text documents stored on your computer; the cookies set by this forum can only be used on this website and pose no security risk. Cookies on this forum also track the specific topics you have read and when you last read them. Please confirm that you accept these cookies being set.

Project merge
#9
(06.04.2017, 22:52)Erwin van der Zwart Wrote: Hi,

Normally you set both to TPUART and turn off all scripts and schedulers from slave, if the master goes down (polled from the slave) then you turn on scripts and schedulers in the slave...

I also created a custom javascript to make clients switch to slave (with window.location) so your visu is also still available on all clients... 

BR,

Erwin

I have made necessary configurations on both Load balancer and Reactor for redundancy between the logic machines and it's working fine.
I also need to have redundancy on the KNX connection so if my IP inteface hangs (which happens sometimes) then the Load balancer could automaticaly change it's Tunneling router IP to point at the Reactor's IP.
Reply


Messages In This Thread
Project merge - by gtsamis - 30.03.2017, 06:37
RE: Project merge - by admin - 30.03.2017, 06:47
RE: Project merge - by gtsamis - 30.03.2017, 06:49
RE: Project merge - by admin - 30.03.2017, 06:52
RE: Project merge - by gtsamis - 30.03.2017, 07:14
RE: Project merge - by gtsamis - 04.04.2017, 12:19
RE: Project merge - by gtsamis - 06.04.2017, 21:46
RE: Project merge - by Erwin van der Zwart - 06.04.2017, 22:52
RE: Project merge - by gtsamis - 06.04.2017, 23:17
RE: Project merge - by Erwin van der Zwart - 07.04.2017, 05:28
RE: Project merge - by gtsamis - 07.04.2017, 06:54
RE: Project merge - by Erwin van der Zwart - 07.04.2017, 08:37

Forum Jump: