04.12.2025, 15:29
Good afternoon,
I'm working on a project that requires integrating a BMS.
I've loaded an ETS project into Logic Machine 5.
If I make changes to objects, group addresses, etc., from within Logic Machine 5,
is there a way to synchronize these changes and send them back to the original ETS project so they are visible in ETS 6?
thank you so much
I'm working on a project that requires integrating a BMS.
I've loaded an ETS project into Logic Machine 5.
If I make changes to objects, group addresses, etc., from within Logic Machine 5,
is there a way to synchronize these changes and send them back to the original ETS project so they are visible in ETS 6?
thank you so much