17.05.2018, 04:36
(This post was last modified: 17.05.2018, 04:37 by phongvucba.)
Hi everybody ! I have a small problem, do not know if anyone can do it?
In LM5 there are Schedulers section (located next to the Scripting section). This part, we can manually change the timer (outside the interface into the Schedulers).
As shown in the figure, I now want to get (GET) the data in this region 1, and save it to an object such as 1/1/1. For example, take the data of the time "Start time", get the date "Days of the week".
Who can get this data can show me, with a script? I am very very thank you everyone!
In LM5 there are Schedulers section (located next to the Scripting section). This part, we can manually change the timer (outside the interface into the Schedulers).
As shown in the figure, I now want to get (GET) the data in this region 1, and save it to an object such as 1/1/1. For example, take the data of the time "Start time", get the date "Days of the week".
Who can get this data can show me, with a script? I am very very thank you everyone!