Hi.
I have an installation with 6 DALI walkways with 60 ballasts each.
The Logic Machine equipment is connected to a UPS.
I have a problem when there is no power supply in the lighting, when the power is restored, everything turns on.
Is there any solution to restore current, return to the previous state or be turned off?
The same problem I have when I turn off the Logic Machine, everything turns on. But I can solve that with a function that, when reset, sends a general shutdown.
I have an installation with 6 DALI walkways with 60 ballasts each.
The Logic Machine equipment is connected to a UPS.
I have a problem when there is no power supply in the lighting, when the power is restored, everything turns on.
Is there any solution to restore current, return to the previous state or be turned off?
The same problem I have when I turn off the Logic Machine, everything turns on. But I can solve that with a function that, when reset, sends a general shutdown.