19.01.2021, 13:43
I thing there is some misunderstanding here. My idea was to use the schedueld "ON" time to calculate how far in advance the room needed to start heating based on outside and roomtemperature. The whole point is to make the room adapt to variations outside so that the room has reached it's setpoint at schedule start, and not to start heating then.