31.01.2021, 09:46
(14.12.2016, 21:35)Erwin van der Zwart Wrote: Hi,
You probably use FW that don't have the function yet..
What HW/FW do you use? (probably HL/SL?)
BR,
Erwin
Hello,
I ask if it's possible maintain the scheduler when I import a modified vsualisation (Becouse i modify the visualisation in my office on my Wiser and after I load it on the costumer's Wiser, in wich the costumer may have modified the time in some or all scheduler).
Best regards