13.05.2021, 08:17
Thanks Edwin for answering
I understand the instructions:
1. I start with the creation of the range of objects of the charges. These should be the group addresses that control them right?
2. I create the range of virtual addresses and give all the input label, which Dpt selects, the one of the objects?
3. I add toggle buttons and associate them with virtual objects.
4. I create the time control (this is where I have doubts).
I add a schedule, which object do I select in the first option?
Once created, how do I add the script as an event. When adding an event if the above object is 1 bit, it just lets me select on / off and I don't see any more options.
All the best.
I understand the instructions:
1. I start with the creation of the range of objects of the charges. These should be the group addresses that control them right?
2. I create the range of virtual addresses and give all the input label, which Dpt selects, the one of the objects?
3. I add toggle buttons and associate them with virtual objects.
4. I create the time control (this is where I have doubts).
I add a schedule, which object do I select in the first option?
Once created, how do I add the script as an event. When adding an event if the above object is 1 bit, it just lets me select on / off and I don't see any more options.
All the best.