14.05.2021, 09:10
Hello
Thank you for responding.
You are absolutely right, by staying only with the intermediate group and the subgroup, respecting the order, there will be no problems.
To do the same with several time controls on the same loads, how could it be done? Duplicating the scripts, modifying their addresses and labels?
or would there be another way to do it?
Thank you very much for your invaluable help.
Greetings
Thank you for responding.
You are absolutely right, by staying only with the intermediate group and the subgroup, respecting the order, there will be no problems.
To do the same with several time controls on the same loads, how could it be done? Duplicating the scripts, modifying their addresses and labels?
or would there be another way to do it?
Thank you very much for your invaluable help.
Greetings