11.02.2017, 13:11
In a room heating system there is a delay from when the heating source is turned on to the room gets the desired set point. If the room is put to 19 degrees at 19.00 we would like to program the schedular to 22 degrees at 07.00. This will not make the room heated before 08.00 or later depending on the heat source and structure. Has anybody made a script that can analyse last day and make the heat go on earlier to try to get the room heated to 07.00 as the schedular says? Or have any good ideas how to make it work?