07.03.2024, 10:34
I'm afraid nothing can be done. In an unlucky event when LM tries to save project and if power failure happen during this time the data can get corrupted. The SQL db has checks for corruption and if this is reported it will be discarded.
The best idea is to use an ups to prevent such situation. Having a backup is a must.
The best idea is to use an ups to prevent such situation. Having a backup is a must.
------------------------------
Ctrl+F5
Ctrl+F5