13.02.2025, 13:08
(13.02.2025, 11:44)Daniel Wrote: You must import ETS project to LM and then create event based script on your active power object, paste this script and change 1/1/2 to the actuator group
if the group adress linked with smartmeter is '0/0/1', can i change the line "value = event.getvalue()" by "value = grp.getvalue('0/0/1')" ?