Posts: 92
Threads: 18
Joined: Apr 2022
Reputation:
0
I have an LM (DR), and every time I make changes to the program, I click on the "snyc project data" button. However, after the LM is powered on again, the program inside is lost. I don't know what happened. Can anyone help me? Thank you in advance.
Posts: 113
Threads: 36
Joined: Oct 2016
Reputation:
1
I can't vouch to say for sure, but it seems that this rarely happened to me too
Posts: 7764
Threads: 42
Joined: Jun 2015
Reputation:
447
System config > System > Shutdown is the correct procedure before powering the device down. It also does full project synchronization. Once LEDs stop blinking you can safely remove the power.