01.09.2026, 13:06
Hi
We have 3 LM which control the light in a park. The 3 LM's may not get online, so they can't communicate in any way.
For sunset and sunrise switching it feels like it's drifting, making the switch-on and -off insimultanious.
We have set the long- and latitude on each LM for out exact location.
How do we make sure it switches on at the same time in the best way?
I did realize some of the LMs had drifted in it's time, so I also adapted the time from my Windows to all 3 LMs, but the problem persists..
Thanks in advance.
We have 3 LM which control the light in a park. The 3 LM's may not get online, so they can't communicate in any way.
For sunset and sunrise switching it feels like it's drifting, making the switch-on and -off insimultanious.
We have set the long- and latitude on each LM for out exact location.
How do we make sure it switches on at the same time in the best way?
I did realize some of the LMs had drifted in it's time, so I also adapted the time from my Windows to all 3 LMs, but the problem persists..
Thanks in advance.